Modular shutdown Division

Modular shutdown Division

  • Insulation (Thermal, Cryogenic & Noise Control)
  • Scaffolding Works
  • Thermographic Survey
  • Abrasive Blasting & Coating

Completed Projects

S.No Project Title Agreement / Service Order Ref Client
1 PAINTING, INSULATION AND WIND GIRDER INSTALLATION TO PENTANE TANK 6D-152A 0430/15/C ADNOC GAS PROCESSING (GASCO)
2 TRAIN II PAINTING AND INSULATION WORKS 0430/040/5 ADNOC GAS PROCESSING (GASCO)
3 FERTIL - Pre Shut Down Work 2000/08-02/ts MIDDLE EAST GEN. ENT. (ASAHI)
4 MARGHAH PLANT SHUTDOWN-DUBAI CAD/044/GK/2997 COSTAIN
5 TANK INSULATION WORKS AT RUWAIS SULPHUR HANDLING EXPANSION PHASE-II 3218/GVS/7637 EMCO
6 TRANSFER LINE COATING BUHASA OHH.06.04 ADNOC GAS PROCESSING (GASCO
7 PAINTING & INSULATION CAMPAIGN @ ASAB-0 AND ASAB-1 140821 ADNOC GAS PROCESSING (GASCO)
8 2008 PAINTING PROGRAMME AT HABSHAN & BAB 145850 ADNOC GAS PROCESSING (GASCO)
9 TRANSFER LINES COATING PHASE 111 - ADD'L WORKS BETWEEN PIT7 & BU-5 133221.101 ADNOC GAS PROCESSING (GASCO)
10 COATING REFURBISHMENT OF FLARE #1 UNDERGROUND PIPING PHASE 2 133650.101 ADNOC GAS PROCESSING (GASCO)
11 SUPPLY OF SCAFFOLDING & INSULATION FOR GASCO HABSHAN PO NO.14209-14218 OCEANERING
12 COMPLETE REFURBISHMENT OF EXTERNAL PAINTING & INSULATION OF LIQUID DEHYDRATOR (14D20313) AND ASSOCIATED PIPING IN BAB PLANT BY HIGH TEMP. RESISANT PAINTING SYSTEM ADNOC GAS PROCESSING (GASCO)
13 FLARE 1 #42" BLOWDOWN LINE COATING REFURBISHMENT 154135.101 ADNOC GAS PROCESSING (GASCO)
14 UNDERGROUND CORROSION SURVEY OF PIPING SCOPE BU#5 WATERLINE 152543.101 ADNOC GAS PROCESSING (GASCO)
15 RUWAIS DEBOTTLECKING - SCAFFOLDING WORKS F/RDP/034dated 04.01.95 ARABTEC
16 PROVISION OF SCAFFOLDING AND MANPOWER SUPPLY. 0430/013/5 ADNOC GAS PROCESSING (GASCO)
17 Scaffolding Services at GASCO Ruwais Debottlenecking Project. F/RDP/044 dated 18.01.95 ARABTEC
18 REFURBISH. OF UNDERDECK INSULATION AND OPEN &CLOSED DRAIN PIPEWORK -UMM AL DALKH CT / 4095012 ADNOC OFFSHORE (ADMA)
19 PAINTING OF TRAIN -I FURNACE 0430/016/5 ADNOC GAS PROCESSING (GASCO)
20 TRAIN -1 ULCS (SHUTDOWN) WORKS 0430/015/5 ADNOC GAS PROCESSING (GASCO)